One (1) surface rig was deployed to conduct exploration drilling in selected boreholes. A combination of destructive and wireline core drilling was necessary to achieve the desired: get high recovery core samples for further analysis for their chemical Fe-Ni content and their geotechnical characteristics. The project required uni- and triaxial lab testing in selected samples.
Project Challenge
The project included a combination of destructive and core drilling down to the desired depth.
Combination of destructive and core drilling
High recovery required
Lab stress tests
RESULTS
The project was successfully executed on time and cores were delivered to Client’s geologists for geological/geotechnical logging, assaying and interpretation of the geotechnical lab results.
Project Information
ClientLarco
LocationGreece
Year launched2018
StatusFinished
Value100 k€
Drilled1,000 meters
Similar challenge?
Talk to our team about your exploration or geotechnical project.