The Perama project has significant upside potential for both high-grade mineralization associated with feeder zones underlying the deposit, and for stratigraphically-controlled lenses downdip from the Perama South deposit. One (1) surface drilling rig was mobilized for exploration and geotechnical reasons to investigate and help build the Perama project.
Project Challenge
Early project build up with exploration and geotechnical boreholes.
Variable rock conditions
Geotechnical drilling with oriented core
High recovery to support metallurgical tests
RESULTS
Since it was the beginning of the Perama project, our findings supported early R&R estimation of early understanding of the geotechnical conditions before the Client submit the technical studies for exploitation permitting.
Project Information
ClientEldorado Gold
LocationGreece
Year launched2013
StatusFinished
Value2 M€
Drilled4,500 meters
Similar challenge?
Talk to our team about your exploration or geotechnical project.