One (1) surface rig was deployed to conduct exploration drilling in a 50x50m grid. A combination of destructive and wireline core drilling was necessary to fulfil project requirements and identify the geometry of subsurface chromite deposit. Vertical boreholes reached a maximum depth of 360m providing useful insight into the geology of the area and the shape of the deposit.
Project Challenge
The project included a combination of destructive and core drilling down to the desired depth.
Combination of destructive and core drilling
High recovery required
Multiple intersected chromite intervals
RESULTS
The exploration program managed to unravel subsurface geometry providing useful insights into the geology of the area and the shape of the deposit.
Project Information
ClientGrevena-Kozani
LocationGreece
Year launched2017
StatusFinished
Value0.5 M€
Drilled5,000 meters