The project included data collection though drilling, geotechnical logging and field mapping to support Bobakas open pit geotechnical assessment. One (1) surface drilling rig and our experienced geological took over data collection and analysis.
Project Challenge
Slope stability and open pit requires special attention to avoid failure during mining.
Oriented drilling and core analysis
Weak zone identification and measurements proposal
RESULTS
A rockmass classification scheme was shaped. Pit design was confirmed for its slope stability and protective measurements were suggested to avoid failure in the identified weak zones.
Project Information
ClientTERNA Magnesites
LocationGreece
Year launched2021
StatusFinished
Value1.0 M€
Drilled1,000 meters
Similar challenge?
Talk to our team about your exploration or geotechnical project.