One (1) underground rig was deployed to drill through the Stratoni fault to further test its prospectivity. Drilling stations were lying in the Mavres Petres mine and drilling exerted very bad geological conditions with cemented hydrothermal breccias and cataclasites related to fault’s movement. The program included both vertical and inclined upward and downward boreholes either from the hanging- or foot-wall of the fault.
Project Challenge
It has been an extremely challenging project that required both the best drilling technique and the best drillers.
Crosscutting fault zone with bad rock conditions
Requirement for best drillers and material
Collapsing borehole
Kaoline-filled joints
RESULTS
The project was successfully executed on time and cores were delivered to Client’s geologists for geological/geotechnical logging and assaying. The results provided new interesting data on the mineralization within and in the surroundings of the fault zone.
Project Information
ClientEldorado Gold
LocationGreece
Year launched2020
StatusFinished
Value1 M€
Drilled7,000 meters
Similar challenge?
Talk to our team about your exploration or geotechnical project.